Molecules To Medicine With Mtor: Translating Critical Pathways Into Novel Therapeutic Strategies

Thảo luận trong 'Học tập' bởi libgeee, 23/5/2024.

  1. libgeee

    libgeee Thành viên kỳ cựu

    Tham gia:
    20/5/2024
    Bài viết:
    6,277
    Đã được thích:
    0
    Điểm thành tích:
    86
    Click Here to Download: https://ouo.io/3B3Tyt
    [​IMG]
    Molecules to Medicine with mTOR: Translating Critical Pathways into Novel Therapeutic Strategies
    By: Maiese, Kenneth
    Publisher:
    Academic Press
    Print ISBN: 9780128027332, 0128027339
    eText ISBN: 9780128027332, 9780128027554, 012802755X
    Pages: 472
    Format: EPUB
    Available from $ 130.00 USD
    SKU 9780128027332
    Molecules to Medicine with mTOR: Translating Critical Pathways into Novel Therapeutic Strategies is a one-stop reference that thoroughly covers the mechanistic target of rapamycin (mTOR). mTOR, also known as the mammalian target of rapamycin, is a 289-kDa serine/threonine protein kinase that is ubiquitous throughout the body and has a critical role in gene transcription and protein formation, stem cell development, cell survival and senescence, aging, immunity, tissue regeneration and repair, metabolism, tumorigenesis, oxidative stress, and pathways of programmed cell death that include apoptosis and autophagy. Incorporating a translational medicine approach, this important reference highlights the basic cellular biology of mTOR pathways, presents the role of mTOR during normal physiologic function and disease, and illustrates how the mechanisms of mTOR can be targeted for current and future therapeutic treatment strategies. Coverage of mTOR signaling includes the entire life cycle of cells that impacts multiple systems of the body including those of nervous, cardiovascular, immune, musculoskeletal, endocrine, reproductive, renal, and respiratory origin.

    Covers the role of mTOR by internationally recognized expert contributors in the field.
    Provides a clear picture of the complexity of mTOR signaling as well as of the different approaches that could target this pathway at various levels.
    Includes analysis of the role of mTOR and in both health and disease.
    Serves as an important resource for a broad audience of healthcare providers, scientists, drug developers, and students in both clinical and research settings.
     

    Xem thêm các chủ đề tạo bởi libgeee
    Đang tải...


Chia sẻ trang này